I'm in Mexico this week for work. On the connecting flight from Huston I counted 42 men and only one other women - she was traveling with a baby and a Mexican passport. I used to like coming to Mexico for work and there used to be other women on the flight.
Monday, January 17, 2011
Sunday, January 16, 2011
Exhausted
My hands are so tired they are hardly capable of typing. I woke up early this morning, cooked a Swiss chard and Camembert frittata for breakfast and then went to work on the basement.
This is how things looked at the end of the day, pretty messy!
Last night at put my curtains back up so I could work at night without feeling like I am on-stage. The shiny thing between the curtains is the new duct work that took three frustrating hours to install. It was a job that I should have been patient enough to wait for help to complete. The 5ft section hanging in the ceiling actually fell on my head at one point. Another project today was insulation. I removed the paper backing from the existing insulation (since it is not code to use in a basement) and installed a roll of insulation I had laying around.
Framing is, still, almost done. I have a plan for finishing the remaining side of the door opening, just need to make another trip to Home Depot for more wood and screws. As a reward for a day of hard work completed I made this desert.
This is how things looked at the end of the day, pretty messy!
Last night at put my curtains back up so I could work at night without feeling like I am on-stage. The shiny thing between the curtains is the new duct work that took three frustrating hours to install. It was a job that I should have been patient enough to wait for help to complete. The 5ft section hanging in the ceiling actually fell on my head at one point. Another project today was insulation. I removed the paper backing from the existing insulation (since it is not code to use in a basement) and installed a roll of insulation I had laying around.
Framing is, still, almost done. I have a plan for finishing the remaining side of the door opening, just need to make another trip to Home Depot for more wood and screws. As a reward for a day of hard work completed I made this desert.
Saturday, January 15, 2011
Late Start
I got a late start this afternoon because I was having my hair color corrected this morning. I had it done on Thursday and the color was a little bold / red for my taste, but it is good now.
Since I didn't get to the basement until the evening I didn't want to anger my neighbors my nailing so I decided to tackle cleaning the other half of the basement so I have space to use the table saw and my Christmas tree isn't getting covered in sawdust.
Turns out that behind the insulation in the corner there was frost on the plywood, so I need want to get some foam insulation to fill the area.
Taking a break with my favorite construction snack, sweet potato fries.
Must Have
I have two requirements for the next place I live and at the top of the list is curbside recycling. Since it got cold in the fall I have not been to the recycling center, but it got to the point that I could barely get in my car because the garage was filled with recyclables. This photo doesn't do the amount of stuff I recycled today justice - the entire trunk and back seat are filled up to the roof.
Tuesday, January 11, 2011
Starting Back Up
It took four passes with my uncle's the power planer and enough wood shavings to fill the trash can, but the "stuck wall" is now in position and ready for me to attach.

After getting the "stuck wall" resolved we framed the wall around the furnace and almost finished one side of the door opening. I was mistaken about having space for a 6ft door, it looks like I actually have just the space for a 5ft door, one way or another that is what is going to come down the staircase
I have to go to Mexico next Monday for work, so my new goal for finishing framing is before I leave the country.
Monday, January 10, 2011
On Hold
My plan to install a 6ft door between the finished and unfinished sections of the basement is on hold after I learned that the 6ft window I had hoped to bring it through only has one removable pane not two. This is putting any further framing on hold. I visited Home Depot this evening hoping they would have an idea, but the only suggestion they had was disassembling the frame to get it down the stairway and then reassembling it in the basement.
I am also in a holding pattern because after moving some junk that was in front of the existing framed wall I learned that it is not inline with the metal support pole. So it looks like I will be building this wall out another two inches to hide the pole in the wall.
This area is turning out to be more tricky than I expected, the duct work is also blocking the trusses so I'm not sure how I'll attach the top plate for the wall around the furnace. So much for thinking I was on schedule - now I'm into the tricky work.
I am also in a holding pattern because after moving some junk that was in front of the existing framed wall I learned that it is not inline with the metal support pole. So it looks like I will be building this wall out another two inches to hide the pole in the wall.
This area is turning out to be more tricky than I expected, the duct work is also blocking the trusses so I'm not sure how I'll attach the top plate for the wall around the furnace. So much for thinking I was on schedule - now I'm into the tricky work.
Saturday, January 8, 2011
On Schedule
Today M helped me install the drop down to go around the duct work. I decided to go with option c and lower the ceiling over the entire width of the stairwell door. There are still have some more pieces to fit in immediately next to the duct since I don't think the drywall can span the entire distance being lowered without additional support.
Also completed today was finishing up the end of the "stuck wall" and tearing out of the studs to make way for the HVAC vent I was convinced to reroute since you can't heat a basement from the ceiling.
Also completed today was finishing up the end of the "stuck wall" and tearing out of the studs to make way for the HVAC vent I was convinced to reroute since you can't heat a basement from the ceiling.
I ran out of 2x4s, yet again, with just the short wall to hide the furnace remaining.
If I can stand to venture out for more wood while the temperatures are in the teens I should be able to finish up the framing tomorrow (less "stuck wall").