This is the tool and materials storage situation I've been working with this Winter. It actually doesn't look too bad right now, usually tools are spread out much further onto the floor.
Monday, May 16, 2011
Tool Box Cleanup
Sunday, May 15, 2011
Window Covering
This post was supposed to be about stick-to-it-iveness, but I ran into trouble that I couldn't overcome. Yesterday's project was hanging curtains, I wanted this to be a one day project and I wasn't going to let anything stop me. Step one was calculating how wide to set the rods and correct spacing with respect to the window. My personal preference is to hang curtains high and wide trying to make the window look as large as possible.
The first road block, came when I tried to drill into the heat duct. Why does the heat duct have to run in exactly the same place where the curtain rod bracket needs to go? This issue was solved with a very short metal drywall anchor and an equally short fine threaded screw.So far so good and it's still light outside. Next stage, sew some curtains. I had about 4 yards of fabric and it took exactly 2.5 to make one panel, no problem, Joann Fabrics is about 2 miles away. Unfortunately, they only had less than 2 yards in stock and I'll need to place a special order to get more.
On the upside I have a lot of molding to paint / stain while I'm waiting for the fabric.
Saturday, May 14, 2011
What Remains?
Doing a mental tally of what construction tasks remain:
1) Flooring - Did I mention that I miscalculated the square footage and came up one box of cork short? I forgot to include the stairwell. The box is scheduled for delivery Monday.
2) Baseboard - The baseboard that I used throughout the rest of the house is too narrow for the floating cork so I'll need to also use quarter round I need to calculate how much material I need and get it painted / stained.
3) Windowsills - I decided on granite because in the Winter I'd like to put plants on the sill and I worry about wood being damaged. The granite has been ordered and will arrive around May 25th.
4) Door - After I rejected the poor quality French door from Home Depot my Dad suggested sliding doors. I priced them out and they will cost about 1/4 of a French Door.
5) Molding - The current door and the new sliding door need molding, I'd like to match existing door molding.
6) Heat Register - it just needs to be installed, why have I procrastinated this long?
1) Flooring - Did I mention that I miscalculated the square footage and came up one box of cork short? I forgot to include the stairwell. The box is scheduled for delivery Monday.
2) Baseboard - The baseboard that I used throughout the rest of the house is too narrow for the floating cork so I'll need to also use quarter round I need to calculate how much material I need and get it painted / stained.
3) Windowsills - I decided on granite because in the Winter I'd like to put plants on the sill and I worry about wood being damaged. The granite has been ordered and will arrive around May 25th.
4) Door - After I rejected the poor quality French door from Home Depot my Dad suggested sliding doors. I priced them out and they will cost about 1/4 of a French Door.
5) Molding - The current door and the new sliding door need molding, I'd like to match existing door molding.
6) Heat Register - it just needs to be installed, why have I procrastinated this long?
Friday, May 13, 2011
Mulch
Loving the look of my freshly mulched front garden. In previous years I used the natural colored cypress mulch, but, this year I switched to the dark brown version. My Aunt and Uncle were out walking the dogs and stopped by while I was putting the stuff down, they agreed with my color choice.
Thursday, May 12, 2011
Tackling the Top Two
For years the top two items on my long and random To Do List have been "Watch Rain Man" and "Ice Cream Maker." Earlier, on the day that M and I planned to watch Rain Man, I was in Salvation Army for Ladies Night (all women's clothes are 50% off and they play fun music) checking out, in a hurry, late for a hair appointment when I spotted the prize - a Donvier Ice Cream Maker - on the counter waiting to be restocked.
It was marked $4.99, but out of nowhere the cashier suggested that it was only worth $3.99 and that's what she charged me. I should be embarrassed to admit that the thing has been in the trunk of my car since before I left for Mexico. Time to hunt for the perfect first recipe, any suggestions? The next two tasks on the To Do List are "Shower Curtain for Upstairs" and "Order Window Sills for Basement," much less fun than movies and ice cream.
It was marked $4.99, but out of nowhere the cashier suggested that it was only worth $3.99 and that's what she charged me. I should be embarrassed to admit that the thing has been in the trunk of my car since before I left for Mexico. Time to hunt for the perfect first recipe, any suggestions? The next two tasks on the To Do List are "Shower Curtain for Upstairs" and "Order Window Sills for Basement," much less fun than movies and ice cream.
Wednesday, May 11, 2011
Vacation in Mexico
When I asked the boss to sign my vacation request for a trip to Mexico he laughed at me since traveling to Mexico for work isn't my favorite. As I hoped the beach in Mexico is a lot more enjoyable than the area where I got for work.
We stayed at an all inclusive resort which was a first for me and very convenient. I did get a little tired of the food toward the end of the trip, but that is my only complaint - otherwise it was a most relaxing vacation.
Our one trip off resort was to the Mayan ruins of Tulum.
We stayed at an all inclusive resort which was a first for me and very convenient. I did get a little tired of the food toward the end of the trip, but that is my only complaint - otherwise it was a most relaxing vacation.
Our one trip off resort was to the Mayan ruins of Tulum.
Subscribe to:
Posts (Atom)

