Monday, January 31, 2011

Electrical Progress

Yesterday I made some progress on the electrical work.  Where framing was a lot of hard labor I feel like electrical mostly involves buying more and more items from Lowe's - I had to spend another $60 there today on switches and plugs, these little things really add up.

The lighting plan calls for the current single switch at the bottom of the stairs to multiply by four.
Thus far I have the light cans up on the ceiling and the blue outlet boxes on the wall, hopefully tomorrow my uncle will teach me how to run wire.

Saturday, January 29, 2011

The Most Important Wire

I spent most of today enjoying good food rather than working on the basement.  Pretty much the only work I did today was with my credit card at Lowes, buying recessed lights and other electrical supplies.
Breakfast was at The Toasted Oak with M's family, lunch was at Panera with my BBBS little sister D, and then for dinner I cooked up mushroom and chard ravioli.
After dinner I got M to string the first wire, a cat5 cable, through the ceiling (he is tall enough he doesn't even need a ladder).

Wednesday, January 26, 2011

Out With the Framing, In With the Electrical

I skipped swim practice and the gym tonight to finish* the framing.  I've gotten in the habit of working with my Uncle on Tuesday nights, but last night I had dinner with M and his co-worker Kimberly who recently got back from a three month stay in Japan...so, this week my Uncle is coming over on Thursday and I had to be ready.

This photo is like Where's Waldo, can you spot the change?  Finally all the boards to hang the ceiling drywall around the duct work are installed.
*The framing isn't completely finished because the wall on the left isn't flush with the corner, I thought I had it figured out but the geometry isn't making sense to me so I need a second opinion before I make any more mistakes on it.
Everything is cleaned up and ready for electrical.  I just need to pick up some electrical boxes and wire over lunch tomorrow.

Saturday, January 22, 2011

What Did I Buy?

As I head off to Home Depot yet again I am calculating what I bought thus far...

100 22s
5lbs of Nails
3 lbs of Screws
2 lbs of Galvonized Nails
5 Screw bits
4 Drill bits
84 2x4 studs
9 Pressure Treated 2x4s2 Pressure Treated 2x6s
5 ft of Round duct
6 ft of Square duct
1 Roll of Foil Tape 
1 Box Sheet Metal Screws
9 Sheets of Foam Insulation
3 Cans of Great Stuff
2 Tubes of Caulk
1 5ft Door 