No pictures today, it is getting hard to see if I have accomplished anything. This is what the countdown to drywall list looks like today:
-Wire 6 more light fixtures
-Wire 3 way lights to switches
-Hook up electrical to main panel
-Eliminate more air leaks with Great Stuff
-Install missed stud
-Run speaker wire
-Finish tacking electrical wires (I don't think I will ever be done with this)
-Confirm code location for smoke detectors
-Install one missed electrical outlet box (I was just shy of the 12ft code requirement)
-Remove insulation from the wrong side of vapor barrier
-Install splitter and run cable to TV wall
-
Buy piggyback breakers (2 20/20 1 15/15)
-Buy more yellow wire nuts
-Install blocking for drywall
-Move Cat5 and speaker wire away from power wires to prevent potential interference